Your new coordinator has been on the team for three days. They know the TMS, they've met the yard crew, and now there's an excavator that needs to get from a dealer in Houston to a job site outside Midland by Friday. They ask what to do first, and you realize most of the answer lives in your head.
Oversized equipment moves don't forgive guesswork. A missing dimension, a delivery site that isn't ready or a phone number nobody wrote down can cost a day, and sometimes more. The good news is that the job is learnable. Most of it comes down to the same handful of questions asked in the same order, every time.
This guide walks through how to bring a new coordinator up to speed on oversized moves in Texas, from the information they need to collect to the first shipment they run with you watching.
Every oversized move starts with accurate shipment information, so teach your coordinator to collect it before anyone talks about trucks or dates. If the details are wrong, everything built on them is wrong too.
Give them a standard intake sheet and walk through each field together. At a minimum, they should collect:
The equipment make, model and serial number
Length, width, height and weight, with any attachments
Pickup and delivery addresses, with on-site contact names
Loading and unloading method at each end
Required delivery window and any hard deadlines
Explain why each item matters. Dimensions and weight decide what trailer can carry the load, whether it needs a permit and which roads it can use. In Texas, the TxDMV states that vehicles or loads that exceed Texas legal size and weight limits must have an oversize/overweight permit and an authorized route, when applicable, before traveling on public roads. A coordinator who understands that link will stop accepting "about twelve feet wide" as an answer.
Never book a move from estimated dimensions. Ask for measurements from the equipment owner or the manufacturer's spec sheet, and note which attachments are staying on.
A new coordinator needs a clear picture of which tasks belong to your team and which belong to the transport provider. Without it, they'll either duplicate work or assume someone else has it covered.
Sit down with them and map the responsibilities for a typical move. Your team usually owns the shipment details, site access and communication with the equipment owner and the receiving site. The carrier handles the transport itself. When you book Texas heavy haul trucking from Titan Worldwide Logistics, for example, its services include route planning, pilot car arrangements and oversize permitting. Your coordinator still needs to confirm who's arranging each of those tasks on every booking, rather than assuming the scope matches the last job.
Write the split down in a one-page responsibility chart. Keep it next to the intake sheet, so the coordinator can check it while they're on the phone.
Cover the communication side too. Decide who updates the equipment owner when the load is picked up, who tells the receiving site when the truck is close and who answers the customer if a date changes. New coordinators tend to wait to be asked, so tell them which updates they send without prompting. A quick message at each stage saves a lot of chasing later, and it shows the customer someone is watching their equipment.
Delivery-site readiness decides whether a truck unloads on arrival or sits waiting. Teach your coordinator to treat the receiving site as part of the move, not as the end of it.
Show them how to confirm the site before the truck leaves. A short call with the site contact should cover:
Whether the access road and gate can take a long, heavy trailer
Where the truck will park and turn
Who will unload the equipment, and with what
Ground conditions after recent rain
Overhead lines, low branches or other obstructions
Ask them to request photos of the access route and unloading area for every new site. A picture of a soft dirt road or a tight gate turn tells you more than a description over the phone.
Remind them that construction and energy sites change quickly. A gate that was open last month may now be blocked by a stockpile, and a crane booked for unloading may have moved to another job. Repeat sites still need a fresh check before each delivery, even when the contact says nothing has changed.
Confirm the site contact the day before delivery, including a mobile number that will be answered when the driver arrives.
Your coordinator won't be strapping down equipment, but they should understand what a properly secured load looks like and when to ask questions. That knowledge helps them spot problems in photos and talk confidently with drivers and site crews.
Start with the basics of cargo securement. FMCSA explains that its rules require each tiedown to be attached and secured in a manner that prevents it from becoming loose, unfastening, opening or releasing while the vehicle is in transit. Show your coordinator photos of well-secured past loads, and point out the chains, binders and how attachments such as buckets or blades sit.
Then explain the checkpoints in a typical move: before loading, after loading, at any planned stops and on arrival. Ask them to request a photo of the secured load before it leaves the pickup site and to file it with the shipment record. If something looks off, they should raise it with the carrier straight away rather than waiting for the delivery report. Ask for a photo of every secured load, even on routine moves, so checking becomes a habit.
On arrival, the same habit applies. Ask the site contact to note any visible damage before the equipment is unloaded and to send photos with the delivery paperwork. Your coordinator should compare those photos with the ones taken at pickup and flag any differences the same day, while the details are still fresh for everyone involved.
Escalation procedures tell your coordinator what to do when a move doesn't go to plan, and who to call. New coordinators often hesitate to escalate, so make it clear that early questions are welcome.
List the situations that always go to a senior team member, such as a missed pickup, a change in dimensions, a site that isn't ready or a delivery deadline at risk. Anything that affects cost, safety or the customer's schedule belongs on that list.
Give them a contact sheet with names, roles and mobile numbers for your team, the equipment owner and the regular site contacts. Include an after-hours number, since oversized moves often run early in the morning.
Ask them to note the time, the problem, who they spoke to and what was agreed. Those notes protect everyone if questions come up later.
A structured handover gives your coordinator the context that never makes it into a process document. Spend time with them going through live and recent shipments, explaining why each decision was made.
Pick a few past moves with different challenges, such as a tight delivery site, a late dimension change or an unusual load. Real examples stick far better than a list of rules, and they show the coordinator how you weigh cost against timing when the options aren't clear. Walk through each one step by step, and ask them what they would have done differently. Then review the current pipeline together and assign them one or two shipments to shadow.
The first weeks shape how a new hire feels about the job, and engagement and retention start on day one. A well-planned handover is one of the simplest ways to get those first days right.
Top Tip: Record a short voice note or video after each shipment your coordinator shadows, covering what went well and what you'd change. Keep the clips in a shared folder labeled by job type. Over time you'll build a library of real examples that a new coordinator can review whenever a similar move comes up, which saves you repeating the same explanations.
The first shipment your coordinator runs should be one they lead and you watch. Choose a move with a reasonable timeline and a site you know well, so the focus is on learning the process rather than handling a crisis.
Let them complete the intake sheet, book the move, confirm the site and update the customer. Check each step before it goes out, and talk through any gaps. On delivery day, stay close but let them take the calls. If they get stuck, ask what they think the next step is before you answer. That question builds judgment faster than stepping in, and it tells you which parts of the process still need more practice before they work alone.
Afterward, hold a short review. Go through the intake sheet, the responsibility chart and the escalation notes, and agree on one or two things to improve on the next move. Hand over a second shipment only after the review, so the lessons from the first one carry forward.
Write down the shipment information you collect, the responsibility split with your carriers and your escalation contacts. Those three pages will give your next coordinator a far better first week, and they'll make your own moves more consistent too.
They need the equipment make, model and serial number, its dimensions and weight, and the pickup and delivery details. They should also confirm the loading method and delivery window.
The TxDMV states that vehicles or loads exceeding Texas legal size and weight limits must have an oversize/overweight permit before traveling on public roads. An authorized route may also be required.
They should lead the shipment while a senior team member checks each step. A short review afterward helps carry the lessons into the next move.