More
Industry Insights
HR Insights
SCOPE News
Friddy Hoegener
23 October 2026
A new manufacturing plant or reshoring project is built in stages: site preparation, construction, equipment installation, commissioning, startup and ramp-up. Leadership hiring works best when it follows the same sequence, so each leader joins in time to shape the part of the plant they will own. Hiring key positions early in a greenfield project lets them come through equipment installation and commissioning, which builds their knowledge of the site and a sense of ownership. Leaders hired late take over equipment and systems that others set up. Leaders hired too early add cost before the plant produces revenue.
The plant manager or site leader is usually the first hire. This person works with the engineering and construction firms, local officials and corporate leadership, and can influence final design decisions while there is still time to adjust them. They also set the culture of the site from the start. The HR leader typically follows soon after to set pay bands for the local market, handle local employment requirements and build the hiring plan for the rest of the team. Before either search starts, make sure corporate leadership, operations and HR agree on the role, the org chart and the budget.
The EHS manager should be on site before heavy equipment installation begins. During construction, the site runs on contractor safety rules. Before the first machine is energized, the plant needs its own safety programs, including lockout/tagout procedures, training and incident reporting. An EHS leader who joins at this stage can manage contractor safety during installation and build the safety culture the plant will run on.
Engineering and maintenance managers need to be in place for factory acceptance testing at the equipment maker's site and site acceptance testing once equipment arrives. Leaders who see the equipment installed and commissioned learn how it was set up and own its performance from day one. IT and OT leaders join in the same window to set up the ERP and MES and connect them to the equipment before production begins.
Supply chain and procurement leaders set up supplier contracts, materials planning and inbound logistics before the first production run. For reshoring projects, start this search earlier. Moving production to the US often means building a domestic supplier base, and qualifying new suppliers for quality and volume takes time.
The quality manager builds the quality management system, writes core SOPs and sets up testing before the first trial runs. Production managers join in the same window and turn the engineering and quality work into daily standard work. Involving them in commissioning, including virtual commissioning with a digital twin where one exists, gives them time to learn the systems before they take over the lines.
Production supervisors and trainers come on board shortly before commissioning to learn the equipment and finalize operator instructions. Frontline operators and technicians are then hired in groups that match the production ramp-up schedule, so each group is trained before its line or shift starts. Hiring manufacturing talent at this scale takes local outreach and a training plan that is ready before the first group starts. State workforce programs can help. Alabama's AIDT offers customized training and applicant assessments at no cost to employers, and Georgia Quick Start provides customized workforce training for companies investing in the state. Local community colleges can also tailor programs to the plant's needs, so contact them early in the project.
The plant manager or site leader is typically the first hire, followed closely by the HR leader. The site leader shapes design decisions, community relationships and culture. HR builds the pay structure and hiring plan for everyone who follows.
Hire the plant manager while the design can still be adjusted and before major equipment is ordered. That gives them time to influence the layout and systems and to build the leadership team that will run the site.
Relocating experienced employees for a set period, such as one to two years, can reduce startup risk. They bring working knowledge of the company's processes and can train local hires until the new team is ready to run the plant.
Look for experience commissioning equipment, building systems and procedures from the start, implementing ERP or MES, and hiring and training a large team. Leaders of capital expansions, new line launches or acquisition integrations often bring transferable experience.
Be specific about the investment, the timeline, the scope of the role and what the leader will build. Candidates weighing a move to an early-stage site want to see that the project is funded and that they will have a real say in how the plant runs.
Leadership hiring for a new plant works best when it follows the project schedule. Start with the plant manager and HR leader. Bring in safety, engineering, systems and supply chain leaders before installation, then add quality, production and frontline teams ahead of commissioning and ramp-up. If you are planning leadership hiring for a new plant or reshoring project, experienced operations recruiters can help you map the sequence and find leaders who have launched plants before.
Complete the form below to start your search for top-tier talent.