SCOPE Recruiting featured image with the text “Where do you find supply chain talent in Alabama?” next to an aerial photo of the Vulcan statue overlooking Birmingham, Alabama, surrounded by autumn trees.

Industry Insights

How to Hire Supply Chain and Manufacturing Talent in Alabama
Read More
SCOPE Recruiting guest blog featured image with the text "Is your team still managing dangerous goods with spreadsheets?" alongside a photo of a man with a beard working on a laptop.

Industry Insights

How Hazmat Shipping Software Helps Enterprises Manage Regulated Freight
Read More
SCOPE Recruiting guest blog featured image with the text "What does AI say about your company when candidates ask?" alongside a photo of a woman in a light blazer looking at her smartphone.

HR Insights

How Employers Can Make Their Jobs and Company Show Up in AI Search
Read More
SCOPE Recruiting blog graphic asking whether employee referral bonuses effectively motivate employees, featuring a woman working on a laptop.

HR Insights

10 Best Digital Gifts for Employee Referral Bonuses and Recruiting Incentives
Read More
Graduation cap and gown with the text “Is your degree filter screening out talent?” and SCOPE Recruiting branding.

HR Insights

Should You Require a Degree or Hire for Skills in Supply Chain?
Read More
SCOPE Recruiting guest blog featured image with the text "What if the interview came to them?" alongside a photo of a smiling recruiter at an outdoor table with a tablet and brochures in front of a mobile office van.

HR Insights

How to Recruit Frontline Workers in Rural Areas: 6 Ways to Bring the Hiring Process to Candidates
Read More
SCOPE Recruiting featured image with the text "How do you hire in a small market?" alongside an aerial photo of a suburban neighborhood bordering open farmland at sunset.

HR Insights

How to Recruit Supply Chain Talent in Rural and Hard-to-Fill Locations
Read More
SCOPE Recruiting case study graphic: Category Lead, 3 weeks time to fill, adhesives manufacturing, St. Paul, MN

SCOPE News

Category Lead Case Study: H.B. Fuller Strategic Sourcing Search
Read More
SCOPE Recruiting case study graphic: Supply Chain Manager, 6 weeks time to fill, packaging manufacturing, Wisconsin

SCOPE News

Supply Chain Manager Case Study: Building a Supply Chain Function at VOLM
Read More
SCOPE Recruiting featured image with the text “Who do you hire before the plant exists?” next to a photo of two workers in hard hats, safety glasses, and high-visibility vests reviewing a laptop inside a manufacturing facility.
Industry Insights

Hiring for a New Manufacturing Plant: Which Leaders to Hire First

Hiring for a new manufacturing plant? See which leaders to hire first, from plant manager and HR to EHS, engineering, supply chain and quality.

Author

Friddy Hoegener

Published

23 October 2026

Last Updated

23 October 2026

A new manufacturing plant or reshoring project is built in stages: site preparation, construction, equipment installation, commissioning, startup and ramp-up. Leadership hiring works best when it follows the same sequence, so each leader joins in time to shape the part of the plant they will own. Hiring key positions early in a greenfield project lets them come through equipment installation and commissioning, which builds their knowledge of the site and a sense of ownership. Leaders hired late take over equipment and systems that others set up. Leaders hired too early add cost before the plant produces revenue.

1. Hire the plant manager and HR leader first

The plant manager or site leader is usually the first hire. This person works with the engineering and construction firms, local officials and corporate leadership, and can influence final design decisions while there is still time to adjust them. They also set the culture of the site from the start. The HR leader typically follows soon after to set pay bands for the local market, handle local employment requirements and build the hiring plan for the rest of the team. Before either search starts, make sure corporate leadership, operations and HR agree on the role, the org chart and the budget.

2. Bring in EHS before equipment arrives

The EHS manager should be on site before heavy equipment installation begins. During construction, the site runs on contractor safety rules. Before the first machine is energized, the plant needs its own safety programs, including lockout/tagout procedures, training and incident reporting. An EHS leader who joins at this stage can manage contractor safety during installation and build the safety culture the plant will run on.

3. Hire engineering, maintenance and IT/OT leaders before installation

Engineering and maintenance managers need to be in place for factory acceptance testing at the equipment maker's site and site acceptance testing once equipment arrives. Leaders who see the equipment installed and commissioned learn how it was set up and own its performance from day one. IT and OT leaders join in the same window to set up the ERP and MES and connect them to the equipment before production begins.

4. Secure supply chain and procurement leaders early

Supply chain and procurement leaders set up supplier contracts, materials planning and inbound logistics before the first production run. For reshoring projects, start this search earlier. Moving production to the US often means building a domestic supplier base, and qualifying new suppliers for quality and volume takes time.

5. Add quality and production leaders before commissioning

The quality manager builds the quality management system, writes core SOPs and sets up testing before the first trial runs. Production managers join in the same window and turn the engineering and quality work into daily standard work. Involving them in commissioning, including virtual commissioning with a digital twin where one exists, gives them time to learn the systems before they take over the lines.

6. Hire supervisors and frontline teams in step with the ramp-up

Production supervisors and trainers come on board shortly before commissioning to learn the equipment and finalize operator instructions. Frontline operators and technicians are then hired in groups that match the production ramp-up schedule, so each group is trained before its line or shift starts. Hiring manufacturing talent at this scale takes local outreach and a training plan that is ready before the first group starts. State workforce programs can help. Alabama's AIDT offers customized training and applicant assessments at no cost to employers, and Georgia Quick Start provides customized workforce training for companies investing in the state. Local community colleges can also tailor programs to the plant's needs, so contact them early in the project.

Frequently Asked Questions

Who should be the first hire for a new manufacturing plant?

The plant manager or site leader is typically the first hire, followed closely by the HR leader. The site leader shapes design decisions, community relationships and culture. HR builds the pay structure and hiring plan for everyone who follows.

When should you hire a plant manager for a new facility?

Hire the plant manager while the design can still be adjusted and before major equipment is ordered. That gives them time to influence the layout and systems and to build the leadership team that will run the site.

Should you relocate existing employees to a new plant?

Relocating experienced employees for a set period, such as one to two years, can reduce startup risk. They bring working knowledge of the company's processes and can train local hires until the new team is ready to run the plant.

What experience should a startup plant manager have?

Look for experience commissioning equipment, building systems and procedures from the start, implementing ERP or MES, and hiring and training a large team. Leaders of capital expansions, new line launches or acquisition integrations often bring transferable experience.

How do you recruit for a plant that hasn't been built yet?

Be specific about the investment, the timeline, the scope of the role and what the leader will build. Candidates weighing a move to an early-stage site want to see that the project is funded and that they will have a real say in how the plant runs.

Conclusion

Leadership hiring for a new plant works best when it follows the project schedule. Start with the plant manager and HR leader. Bring in safety, engineering, systems and supply chain leaders before installation, then add quality, production and frontline teams ahead of commissioning and ramp-up. If you are planning leadership hiring for a new plant or reshoring project, experienced operations recruiters can help you map the sequence and find leaders who have launched plants before.

 

Author

Friddy Hoegener

Date

23 October 2026

Back to Insights
Visit Our Career Page
About Us Why Work With Us? Find Talent

Let's
Talk!